Zeitpunkt Nutzer Delta Tröts TNR Titel Version maxTL Mi 17.07.2024 00:01:10 61.956 -1 3.550.157 57,3 Fosstodon 4.2.10 500 Di 16.07.2024 00:00:36 61.957 +6 3.547.999 57,3 Fosstodon 4.2.10 500 Mo 15.07.2024 00:00:01 61.951 +1 3.544.794 57,2 Fosstodon 4.2.10 500 So 14.07.2024 00:00:00 61.950 +2 3.542.390 57,2 Fosstodon 4.2.10 500 Sa 13.07.2024 00:00:08 61.948 +1 3.539.632 57,1 Fosstodon 4.2.10 500 Fr 12.07.2024 00:01:45 61.947 +6 3.537.376 57,1 Fosstodon 4.2.10 500 Do 11.07.2024 00:00:37 61.941 +12 3.533.951 57,1 Fosstodon 4.2.10 500 Mi 10.07.2024 00:00:53 61.929 +5 3.530.507 57,0 Fosstodon 4.2.10 500 Di 09.07.2024 00:00:08 61.924 +2 3.527.175 57,0 Fosstodon 4.2.10 500 Mo 08.07.2024 00:00:19 61.922 0 3.524.369 56,9 Fosstodon 4.2.10 500
AkaSci 🛰️ (@AkaSci) · 10/2022 · Tröts: 4.429 · Folger: 4.865
Mi 17.07.2024 15:40
All major structures for every SLS core stage are fully manufactured at the NASA Michoud Facility in New Orleans.
Beginning with Artemis III, to better optimize space at Michoud, Boeing, the SLS core stage prime contractor, will use space at NASA Kennedy for final assembly and outfitting activities.
https://www.nasa.gov/michoud-assembly-facility/
https://en.wikipedia.org/wiki/Michoud_Assembly_Facility
3/n
1. Aerial pic of the NASA Michoud Assembly Facility in NOLA 2. The Michoud main manufacturing building and the twin vertical assembly buildings as seen from a drone in January 2020. The Artemis 1 core stage is being rolled out, along with a crowd of workers 3. Pic of SLS core stage inside an assembly hall
[Öffentlich] Antw.: 0 Wtrl.: 1 Fav.: 1